Distinguish between project and product scope


Discussion Post: Requirements Management Process

• How can a project manager plan for effective stakeholder engagement while planning the project's scope?
• Outline 2 requirements elicitation tools you (as PM) would use to gather stakeholders' requirements.
• Describe the MoSCoW technique used for requirements/deliverables categorization in the project scope process.
• Also give an example of a categorized requirement/deliverable

Assignment: Project Management

Part I: Overview of Scope Management: & Plan Scope Mgt

1. Define and identify examples of project "scope" and "requirements"
2. Distinguish between project and product scope
3. Assess how the project business case and charter can be used as a foundation for planning project scope
4. Identify common components of the project scope management plan
5. Develop a high-level project scope management plan

Core Element of Scope Mgt

Read your assigned materials and conduct library or on line research to effectively answer the following questions:

a) What is the difference between a project requirement and a project deliverable? Please give me an example of a requirement and a deliverable.

b) How does a project Scope Statement serve as a necessary communications document to all relevant project stakeholders?

Part II: Project Requirements: Collect Requirements

1. Identify and analyze the qualities of well-written requirements: SMART and testable

2. Know the general requirements collection process steps and become familiar with best practice requirements collection techniques

3. Practice techniques for eliciting stakeholder's input to develop effective and feasible requirements success criteria

4. Distinguish between different types of requirements (functional, Non-functional, technical, project, regulatory, etc.)

5. Analyze techniques used to differentiate the needs /vs/ wants of stakeholders for a project: MoSCoW technique

6. Understand the purpose of an effective Requirements Management Plan (RMP): Create an RMP

Format your assignment according to the give formatting requirements:

a. The answer must be double spaced, typed, using Times New Roman font (size 12), with one-inch margins on all sides.

b. The response also includes a cover page containing the title of the assignment, the course title, the student's name, and the date. The cover page is not included in the required page length.

c. Also include a reference page. The references and Citations should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Project Management: Distinguish between project and product scope
Reference No:- TGS03044029

Now Priced at $40 (50% Discount)

Recommended (97%)

Rated (4.9/5)