Discuss the work activities to include work packages


Project Assignment

Write a 3-4 page paper that includes the following components of the project work plan:

Work Plan

• Work Activities to include work packages and Work Breakdown Structure

• Schedule allocation (includes at a minimum use of the Critical Path Method Activity Network with full analysis of slack and critical path completion time as well as development of a task-Gantt Chart)

• An initial resource allocation plan

• An initial budget allocation plan.

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Project Management: Discuss the work activities to include work packages
Reference No:- TGS02982451

Now Priced at $35 (50% Discount)

Recommended (99%)

Rated (4.3/5)