Discuss the control charts you have constructed


Homework

The purpose of this homework is to provide the students the opportunity to carry out the full scope of a Statistical Process Control procedure, on a real-world business process of their own choosing. The homework, and the deliverable report, comprise the following parts.

Process: Describe a business and a business process you have chosen for this homework. You can use ideas from the examples covered in class or the end-of-chapter problems. Be sure that you can gain thorough knowledge of the process and that you have access for data collection through observation or by taking measurements.

CTQ: Describe a critical-to-quality characteristic of the output of the process, which could be either a product or a service. Explain why such characteristic is critical, in your judgement.

SPC Type: Inform and justify your selection of an appropriate SPC type for controlling the CTQ of your choice.

Data: Collect appropriate sample data for the CTQ variable or attribute, as well as the sampling plan you have adopted. Depict your data in a tabular form.

Analysis: Calculate SPC parameters, and construct the control chart(s) by plotting. Represent you sample data on the charts.

Conclusion: Discuss the control charts you have constructed and draw conclusions with respect to process stability.

Recommendations: Given the state of the process, which you have investigated, what improvement recommendations you can offer to the process owner or operator?

Format your homework according to the give formatting requirements:

1. The answer must be double spaced, typed, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also includes a cover page containing the title of the homework, the course title, the student's name, and the date. The cover page is not included in the required page length.

3. Also include a reference page. The references and Citations should follow APA format. The reference page is not included in the required page length.

Attachment:- Homework.rar

Solution Preview :

Prepared by a verified Expert
Operation Management: Discuss the control charts you have constructed
Reference No:- TGS03039459

Now Priced at $40 (50% Discount)

Recommended (97%)

Rated (4.9/5)