Develop an acceptance sampling plan


Joshua Simms has recently been placed in charge of purchasing at the Med-Tech Labs, a medical testing laboratory. His job is to purchase testing equipment and supplies. Med-Tech currently has a contract with a reputable supplier in the industry. Joshua's job is to design an appropriate acceptance sampling plan for Med-Tech. The contract with the supplier states that the acceptable quality level is 1% defective. Also, the lot tolerance proportion defective is 4%, the producer's risk is 5%, and the consumer's risk is 10%.

(a) Develop an acceptance sampling plan for Joshua that meets the stated criteria

Request for Solution File

Ask an Expert for Answer!!
Finance Basics: Develop an acceptance sampling plan
Reference No:- TGS047003

Expected delivery within 24 Hours