Develop a waterfall approach milestone-level project plan


Assignment: Systems Analysis and Development

Part I: Comparing SDLC Approaches and Recommendation

You have been hired to implement the CRM system for WeLoveVideo. Part of your job is to propose and recommend a project approach based on several models.

A meeting is scheduled for next week with the WeLoveVideo CIO to discuss your recommendations on the project approach.

Prepare for this meeting by developing a 6 to 8 slides multimedia-rich presentation with speaker notes that explains the Waterfall and Agile SDLCs and how your team will guide WeLoveVideo. Include the following in your presentation:

i. Explain the typical phases that comprise an entire systems project of Waterfall and Agile SDLCs

ii. Identify differences in documentation produced, with an explanation as to why it would or would not be used

iii. Explain stakeholder expectations that should be set based on the chosen SDLC

iv. Determine the pros and cons associated with each Waterfall and Agile SDLC

v. Include a relevant graphic summary or chart comparing Waterfall and Agile for the WeLoveVideo CRM project, including features, team, delivery, and feedback

vi. Identify attributes within WeLoveVideo that would dictate your recommendation on the type of SDLC you would lean toward Presentation Note: The slides in your multimedia-rich presentation should only contain essential information and as little text as possible. Do not design a slide presentation made up of long bullet points. Your speaker notes must convey the details you would give if you were presenting. Review the Create Speaker Notes video for more help.

vii. Compose an executive summary to accompany your presentation that includes your SDLC recommendation and references to support your recommendation. This summary for the executive team is typically 1 to 2 pages in length.

Part II: Project Plans

After consideration of your proposal from Part I, the WeLoveVideo CIO is having a hard time envisioning how the project would be executed based on your recommendations. She has asked your company to develop a project plan in both Waterfall and Agile so she can better understand the implications to her team.

Use Microsoft Excel, Project, or another project management tool of your choice (and approved by your instructor) for your project plans.
Design a Waterfall and an Agile milestone-level project plans for the WeLoveVideo CIO in which you:

i. Develop a Waterfall approach milestone-level project plan with inputs and outputs for each phase of the project based on the SDLC with milestones at the end of each project phase and within phases, if applicable

ii. Design a Waterfall approach milestone-level project plan with comprehensive SDLC phases

iii. Develop an Agile approach milestone-level project plan with inputs and outputs for each phase of the project based on the SDLC with milestones at the end of each project phase and within phases if applicable

iv. Design an Agile approach milestone-level project plan with comprehensive SDLC phases

Format your assignment according to the following formatting requirements:

i) The answer should be typed, using Times New Roman font (size 12), double spaced, with one-inch margins on all sides.

ii) The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

iii) Also include a reference page. The Citations and references must follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Project Management: Develop a waterfall approach milestone-level project plan
Reference No:- TGS03123907

Now Priced at $70 (50% Discount)

Recommended (95%)

Rated (4.7/5)