Develop a resource management plan for the anchorage ak


PROJECT ASSIGNMENTS SCENARIO

You have been assigned to the Project Manager role fora project in Anchorage, Alaska where it snows 12" daily (or so it seems), and sometimes reduces air traffic to 1 flight in and 1 flight out daily.

The city wishes to upgrade its technology center with current hardware and software, and hand off 24-hour phone support to a vendor based in India.

The core project team is located in Anchorage and consists of the following:

• The Project Sponsor is the Mayor, Dan Sullivan.

• In addition to the mayor, you have the current technology director and 4 technicians.

o The Technology Director is Mitch Stevens. Mitch is very knowledgeable and knows the current center inside and out.He is an introvert whostores everything in his head andloves to hunt.

o The 4 Technicians are Brad (new to the team), Katie (a 5-year veteran whois 5 months pregnant), and Bob and Mick (local college students).

• The Procurement Team is located in Juno. As it supports the entire state, they stay busy procuring for everyone.

o All hardware will be made to order and is to be built by Dell.

o Juno is in the middle of their city technology center upgrade and may have enough hardware to cover Anchorage, as they changed plan mid-project. However,youwon't know for another month or 2 what, if anything, may be available.

o COTS software will be used where possible, but there is 1application that connects all units in the building which has not yet been developed.

• The Development and TestingTeams are located in Delhi, India.

o Their lead team Project Manager is Kumar, and he is located in Alaska with you. He will also be the lead for the support team that needs to be assembled and trained, but those contracts have not yet been signed. You will need to make sure this happens.

The project will be completed in 6 months and cost $500k and is scheduled to start in 1 month.

You will need to create a high level project plan (Resuiremtns, Design, Build,Test, and Release) to support you work, add resources and cost (assumed - this is not graded) to each section, to support your work. Use this timeline.

PROJECT ASSIGNMENTS INSTRUCTIONS

You will complete 4 project assignments in response to the provided scenario. You may have to build a small project plan, and make some assumptions. Each project submission must follow current PMBOK guidelines.

Each submission must include 1 biblical integration summary that ties the current week topic back to Biblical project management.In your introductions and section summaries you will reference the textbook and other scholarly articles.

I expect to see this cited and a reference page added in APA format. No other APA formatting is required as I expect you to utilize list, tables, charts, etc. to complete each document. Remember that this is a project document, search the internet for examples to get a look and feel for each, then follow PMBOK to build your documents. The 4 parts of this project are:

1. Project: Resource Management Plan-Utilizing PMBOK, the course text, and thediscussion with your classmates in Modules/Weeks 1-2, develop a Resource Management Plan for the Anchorage, AK Technology Project. Use PMBOK as your guide to what to include.

2. Project: Communication Plan-Utilizing PMBOK, the course text, and thediscussion with your classmates in Modules/Weeks3-4, develop a Communication Plan for the Anchorage, AK Technology Project. Use PMBOK as your guide to what to include.

3. Project: Risk Register and Risk Management Plan-Utilizing PMBOK, the course text, and thediscussion with your classmates in Modules/Weeks5-6, develop a Risk Register and Risk Management Plan for the Anchorage, AK Technology Project. Use PMBOK as your guide to what to include.

4. Project: Procurement Management Plan-Utilizing PMBOK, the course text, and thediscussion with your classmates in Modules/Weeks7-8, develop a Procurement Management Plan for the Anchorage, AK Technology Project. Use PMBOK as your guide to what to include.

Solution Preview :

Prepared by a verified Expert
Operation Management: Develop a resource management plan for the anchorage ak
Reference No:- TGS02731242