Develop a production schedule


Case Scenario: A small furniture manufacturer produces tables and chairs. Each product must go through three stages of the manufacturing process - assembly, finishing, and inspection. Each table requires 3 hours of assembly, 2 hours of finishing, and 1 hour of inspection. Each chair requires 2 hours of assembly, 2 hours of finishing, and 1 hour of inspection. The profit per table is $120 while the profit per chair is $80. Currently, each week there are 200 hours of assembly time available, 180 hours of finishing time, and 40 hours of inspection time. Linear programming is to be used to develop a production schedule. Define the variables as follows:

T = number of tables produced each week
C = number of chairs produced each week

According to Exhibit, which describes a production problem, which of the following would be a necessary constraint in the problem?

a. T + C < 180

b. 120T + 80C > 1000

c. T + C < 200

d. T + C < 40

e. none of the above

Solution Preview :

Prepared by a verified Expert
Operation Research: Develop a production schedule
Reference No:- TGS01752739

Now Priced at $25 (50% Discount)

Recommended (97%)

Rated (4.9/5)