Develop a physical design for the intersection


HCS Project:

Due to the development of a new regional shopping center, a major new intersection must be provided for significant movements into and out of the shopping center. The main entrance to the shopping center is on the North side of the intersection. The expected demands for the new intersection are given below. There will be 3% trucks into and out of shopping center and 1% trucks everywhere else. There are 20 buses per hour stopping on the right side of each approach in all directions except leaving the shopping center, which has zero.

137_Demands for the new intersection.jpg

The tasks for this project are as follows:

Assignment Task 1: Develop a physical design for the intersection, that is, how many lanes and what channelization for the lanes.

Assignment Task 2: Develop a complete signal timing plan - assume a pre-timed signal.

Assignment Task 3: Using HCS software, run an HCM analysis of how the intersection is expected to operate under the proposed design and signal timing. You may not have any lane groups with LOS of E or F. You do not want lane group v/c ratios greater than 0.95

Assignment Task 4: The fewer lanes you use and still keep a LOS of D or better, the higher your grade.

Assignment Task 5: Make sure the design works in the simulation

It is advisable to take online assistance from the Physical Design for the Intersection Assignment Help service, in order to excel your academic grades.

Tags: Physical Design for the Intersection Assignment Help, Physical Design for the Intersection Homework Help, Physical Design for the Intersection Coursework, Physical Design for the Intersection Solved Assignments, Signal Timing Plan Assignment Help, Signal Timing Plan Homework Help, HCM Analysis Assignment Help, HCM Analysis Homework Help

Request for Solution File

Ask an Expert for Answer!!
Civil Engineering: Develop a physical design for the intersection
Reference No:- TGS03026864

Expected delivery within 24 Hours