Develop a linear programming model with the data


Problems:

Linear Optimization

Develop a linear programming model with the data from tables 1-5

Make or Buy(maximize profit /minimize cost)

There are Four orders for the next 90 days

Orders are to be Completed 90 Days

Products are shown in Table 1.

The orders are shown in Table 2

Table 3 lists the amount of plate steel required to produce one unit of each product and the total amount of steel on hand

The total time available (in hours) and the processing time requirements of each product (in minutes) are shown in Table 4.

Table 5 contains the cost to manufacture and purchase each product. Note: material and labor costs are included in the costs shown in the second column of the table.

Table 1

Part#

Description

106C

10' x 6" Casing

206C

20' x 6" Casing

206C10R

10' Radius Casing

206C20R

20' Radius Casing

1012C

10' x 12" Casing

2012C

20' x 12" Casing

2524RW

25' x 24" R&W Pipe

5024RW

50' x 24" R&W Pipe

5036RW

50' x 36" R&W Pipe

5072RW

50' x 72" R&W Pipe

5084RW

50' x 84" R&W Pipe

24ME

24" Mitered Elbow

36ME

36" Mitered Elbow

72ME

72* Mitered Elbow

84ME

84" Mitered Elbow

 

 

 

 

 

 

 

 

 

 

 

Part-2

Part #

Produce

Purchase from Midnight

106C

$512

$640

206C

$925

$1,156

206C10R

$650

 

206C20R

$1,039

 

1012C

$1,428

$1,785

2012C

$1,817

$2,271

2524RW

$2,206

$2,758

5024RW

$2,595

$3,244

5036RW

$2,984

$3,730

5072RW

$3,373

$4,216

5084RW

$3,762

$4,703

24ME

$4,151

 

36ME

$4,540

 

72ME

$4,929

 

84ME

$5,318

 

 

 

 

 

 

 

 

 

 

 

 

Solution Preview :

Prepared by a verified Expert
Mathematics: Develop a linear programming model with the data
Reference No:- TGS01918008

Now Priced at $20 (50% Discount)

Recommended (96%)

Rated (4.8/5)