Develop a flowchart for any major software component of the


Assignment: WireLess Mobile Charging Station

1. Design the major analog and digital functional blocks. Perform and include any preliminary engineering calculations that support the design. (Actual simulation results can be presented next week.)

2. Develop a Preliminary Design Schematic. Use a schematic capture program such as MultiSIM to construct an electronic schematic, if relevant, of any major functional blocks.

3. Develop a flowchart for any major software component of the system (Must be detailed and ready to be programmed). Code of critical blocks of software may be submitted next week.

4. Develop a component list based on the components identified to date.

5. Submit all the documents above alone with the documents compiled in the last assignment of ET410:

o Project Proposal
o Requirements Document
o System Design Review
o Final Schedule
o Final Budget.

Attachment:- Attachments.rar

Solution Preview :

Prepared by a verified Expert
Other Engineering: Develop a flowchart for any major software component of the
Reference No:- TGS02227842

Now Priced at $95 (50% Discount)

Recommended (90%)

Rated (4.3/5)