Develop a cost plan for project that identifies allocation


Project Assignment: WBS, Schedule and Budget

Instructions

WBS chart: Create a WBS. Include an explanation of the hierarchical relationship among each level on the chart. Level one should depict the end result (a product or a service) of the project. Level two should consist of the major tasks outlined in the statement of work (SOW). Level three should list the subtasks contained in each SOW task. You can use the series of charts available in Microsoft Project (although you are not required to use Microsoft Project). Submit your answers in a Microsoft Word document with the supported Microsoft Excel spreadsheets, Microsoft Project files, and other documentation as needed.

Schedule: Sequence the tasks in the order of completion. Arrange the work breakdown structure elements in the form of a task-flow network to determine dependencies. Identify the critical path along which necessary resources should be allocated to achieve the project objectives within the defined time frame. Indicate the earliest occurrence and highlight the critical path. Use a Gantt chart to illustrate the start and completion dates of each task. Consider whether the tasks can be completed in parallel or must be performed in sequence.

Cost plan: Develop a cost plan for your project that identifies the allocation and cost of resources to your project.

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Project Management: Develop a cost plan for project that identifies allocation
Reference No:- TGS03017169

Now Priced at $45 (50% Discount)

Recommended (97%)

Rated (4.9/5)