Develop a checklist for testing the application


Assignment: Testing And Deployment

Now that you have completed the design review, and your system is built. It will be time to verify that all is functioning as expected.

Develop a checklist for testing the Application before it is deployed into Production.

The checklist should include but not be limited to the following:

• Use a cross-section of users who can verify that the functionalities are available based on the system requirements
• Verify that accessibility is available based on design requirements
• Data migration process functionality if that is a part of the design process

Develop a plan and time frame for production deployment.

This must include the following:

• System installation and configuration
• Data migration schedule
• Schedule of system downtime
• Cross-section of users for testing immediately after the cut-over
• Fallback plan if planned cutover does not succeed.

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Attachment:- Charles-Williams.rar

Request for Solution File

Ask an Expert for Answer!!
Computer Engineering: Develop a checklist for testing the application
Reference No:- TGS02987281

Expected delivery within 24 Hours