Determine which information-gathering tools would effective


Homework

Length: 1050 to 1400 words.

Review the JP Phentar Construction: Case Study in Ch. 11 of A Comprehensive Guide to Project Management Schedule and Cost Control.

Complete the following: (Break paper into these sections with headings and an introduction and conclusion)

1. Determine which information-gathering tools would be most effective for this project and what activities would need to be monitored.

2. Based on data that would be generated from work activities, what types of analytical tools could be used to determine project status?

Format your homework according to the give formatting requirements:

1. The answer must be double spaced, typed, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also includes a cover page containing the title of the homework, the course title, the student's name, and the date. The cover page is not included in the required page length.

3. Also include a reference page. The references and Citations should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Project Management: Determine which information-gathering tools would effective
Reference No:- TGS03106774

Now Priced at $60 (50% Discount)

Recommended (92%)

Rated (4.4/5)