Determine the probable production in cubic yard bank


Question: Determine the probable production in cubic yard bank measure (bey) for a 2-cy dragline when excavating and casting tough clay. The average depth of the excavation is 9 ft, and the average angle of swing will be 140°. The efficiency factor will be a 45-min hour.

Solution Preview :

Prepared by a verified Expert
Accounting Basics: Determine the probable production in cubic yard bank
Reference No:- TGS02396344

Now Priced at $15 (50% Discount)

Recommended (92%)

Rated (4.4/5)