Determine the probable production in cubic yard bank


Determine the probable production in cubic yard bank measure (bcy) for a 2-cy dragline when excavating and casting good common earth.

The average depth of the excavation is 12 ft, and the average angle of swing will be 1200. The efficiency factor will be a 45-min hour.