Determine the probable production in cubic yard bank


Determine the probable production in cubic yard bank measure (bey) for a 2-cy dragline when excavating and casting tough clay.

The average depth of the excavation is 9 ft, and the average angle of swing will be 140°. The efficiency factor will be a 45-min hour.

Request for Solution File

Ask an Expert for Answer!!
Mechanical Engineering: Determine the probable production in cubic yard bank
Reference No:- TGS01627778

Expected delivery within 24 Hours