Determine the order in which the gasolines should be


Each day, Sunco manufactures four types of gasoline: lead-free premium (LFP), lead-free regular (LFR), leaded premium (LP), and leaded regular (LR). Because of cleaning and resetting of machinery, the time required to produce a batch of gasoline depends on the type of gasoline last produced. For example, it takes longer to switch between a lead-free gasoline and a leaded gasoline than it does to switch between two lead-free gasolines. The time (in minutes) required to manufacture each day's gasoline requirements are shown in Table 75. Use a branch-and- bound approach to determine the order in which the gasolines should be produced each day.

Request for Solution File

Ask an Expert for Answer!!
Mathematics: Determine the order in which the gasolines should be
Reference No:- TGS01412750

Expected delivery within 24 Hours