Determine the capability requirements in a timely manner


Question: When looking at urgent or emergent operational needs which of the following may be done to determine the capability requirements in a timely manner? A. The capabilities-based assessment can be skipped if off the shelf hardware is available B. The scope of the capabilities-based assessment may be reduced C. The capabilities-based assessment can be conducted after the new equipment is fielded