Determine the average cycle time for element


Assignment:

A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are shown in the following table.




OBSERVATIONS (minutes per cycle)

Element Performance
Rating
1 2 3 4 5 6
1 90%        0.44 0.50 0.43 0.45 0.45 0.46
2 85           1.50 1.56 1.47 1.51 1.49 1.52
3 110           0.84 0.89 0.77 0.83 0.84 0.80
4 100           1.10 1.14 1.08 1.14 1.16 1.26

a. Determine the average cycle time for each element.

b. Find the normal time for each element.

c. Assuming an allowance factor of 18 percent of job time, compute the standard time for this job.

Solution Preview :

Prepared by a verified Expert
Operation Management: Determine the average cycle time for element
Reference No:- TGS02135149

Now Priced at $25 (50% Discount)

Recommended (97%)

Rated (4.9/5)