Determine the architecture of the system as web-based


Assignemnt: Databases and Ms Project

Airline Ticket Purchase System

Project Deliverables (Please include a section in the document for each of the below)

The project requires students to perform three phases: (a) requirements analysis, (b) system and database design, and (c) a project plan. Note that in the phase 3, students are required to use the MS Project software for their project schedule.

The deadline for the Individual Project can be found in the schedule section of the class syllabus.

The following layout format covering a title page and all three phases is recommended for the project.

Title page (project name, author, and date)

Phase 1: Requirement analysis

A. Problem definition
B. Issues
C. Objectives
D. Requirements
E. Constraints
F. Description of the proposed system
G. Logical model design

Data flow diagrams
Context diagram
Diagram 0
Descriptions of processes in each diagram
Descriptions of outputs/inputs/performance/security or controls

H. Specific requirements, if any (interface, operational, resource, performance, etc.)

Phase 2: System and database design

A. User interface

Design an overall user interface consisting of screens, commands, controls, and features to enable users to use the system.

How data will be input to the system?

The physical layout for each input
The input design and procedures
How data will be output from the system?
The physical layout for each output
The output design and procedures

B. Data design

Develop a plan for data organization, storage, updating, and retrieval.
Database design
Database tables with their attributes should be presented
Primary key(s) should be identified in each table, if any
Three steps of normalization should be included.
Entity-relationship diagrams
Data file storage and access

C. System architecture

Determine the architecture of the system as Web-based interface, client/server architecture, Internet/Intranet interface, network configuration, etc.

Phase 3: Project plan

A list of tasks or activities needed for implementing the proposed system

Estimating completion time and costs

A project schedule for performing those activities (Gantt charts or PERT charts)

Note that there is no other required software package except the MS Project software in this ITEC-630 course. As a result, you are only required to use the MS Project software to handle the scheduling part of the project and for other parts, you can use any word editing software or any drawing tools software.

Solution Preview :

Prepared by a verified Expert
Database Management System: Determine the architecture of the system as web-based
Reference No:- TGS02250847

Now Priced at $75 (50% Discount)

Recommended (95%)

Rated (4.7/5)