Determine performance measurement baseline for ms project


Assignment: Earned Value Management (EVM)

Use the Internet or the Strayer Library to research articles on EVM.

Project managers often use Earned Value Management (EVM) if they want to compare the status of their projects to their project plans. Using the same project from Assignment, develop a project scenario to explain the amount of work that you have completed with the funds allotted.

This assignment consists of two sections:

• MS Project Exercise
• EVM paper

• You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment for which it is written. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment.

Section 1: MS Project Exercise

Assume that your project is using more resources (e.g., time, money, and / or other non-labor resources, etc.) than anticipated through 50% of the project duration.

1. Update the project schedule to reflect related resource changes.

2. Produce a series of EVM reports from MS project that illustrates your project's performance. Note: Your reports should focus on the cost and schedule performance of the project.

Section 2: EVM Paper

Write a two to three page paper in which you:

3. Summarize the resource changes of your project, and discuss the performance results of your project.

4. Determine one performance measurement baseline for your MS Project. Justify your response.

5. Apply earned value analysis (EVA) in order to forecast future cost issues. Justify your response.

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also include a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also Include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

• The specific course learning outcomes associated with this assignment are:
• Appraise the process of determining the cost and relevant budget required for a project component.
• Analyze quality assurance processes in project management.
• Use technology and information resources to research issues in project estimating and budgeting.
• Write clearly and concisely about project estimating and budgeting using proper writing mechanics.