Determine amount of excavation needed for the basement


1. Determine the amount of excavation needed for the basement. A 2 foot working distance is required and the excavation will be sloped 1.5:1 (1.5 vertical foot for every horizontal foot)

2. Determine the amonut of backfill needed for the basement in Problem 1. Ignore any backfill inside the walls.