Designing a bridge-withstand 4 fully loaded semi-trailers


Lots of bridge designs today contain simple geometrical components but are constructed into complex ways to ensure that relevant base and safety loads are catered for. Bridges are multi-material solutions to withstand the static and dynamic loads that are exerted onto them.

This assignment consists of the following sections – all which must be addressed in your final report:

1) Design a bridge that will withstand 4 fully loaded semi-trailers (example: 2 going in each direction) at the central point, being aware of both static and dynamic loads, the span of the bridge will be 200 meters in length; width is whatever you determine it must be as suitable but limit yourself to two lanes.

2) Use a minimum of 2 materials and a maximum of 5 materials in your design, it can be any currently available material you choose, but you need to justify your selections.

3) You do not need to consider the connection of the bridge to ground, just assume a rigid stable connection.

4) In your report you need to include loading diagrams, stress analysis of at least 4 different sections of geometry using content developed through this subject plus other resources. 2 analyzed sections must be where 2 materials are joining. As well as any engineering drawings that will be required to fully explain the joint.

5) This is a hand calculation based assignment thus no FEA will be accepted.

6) Keep geometry sections to simple, commercially available shapes.

7) All literature must be properly referenced.

This must be done as your own personal piece of work, no group work allowed.

This assignment must be presented as a formal methodical report with clear unambiguous references. All calculations and assumptions must be provided together with a full explanation of all the terms used. This assignment must be typed and in Microsoft Word *.docx format and submitted via DSO. No hand written or hand submitted assignments will be accepted.

Extensions will only be granted if asked for in writing (email) three days before the due date; a maximum of 7 days will be granted if circumstances are valid – having other assignment due is not a valid reason. Students can only ask for one extension for the trimester period – thus if you have an extension for assignment one you are not able to have another extension for assignment 2 unless under very exceptional circumstances. If your assignment is greater than three days late you will receive zero for that assessment task.

Request for Solution File

Ask an Expert for Answer!!
Mechanical Engineering: Designing a bridge-withstand 4 fully loaded semi-trailers
Reference No:- TGS083

Expected delivery within 24 Hours