Design team for building an overhead bridge crane


You are on the design team for building an overhead bridge crane for use in-house within the company. The design team is considering a proposal to place a switch box on the wall with toggle on/off switches for control of the bridge, trolley, and hoist, respectively. What would be your design input to this committee?

Explain the rationale behind your recommendations.

Request for Solution File

Ask an Expert for Answer!!
Operation Management: Design team for building an overhead bridge crane