Describe the activity on node and activity on arrow diagram


Business Assignment: Network Diagram

Instructions

Write an Essay that exceeds 500 words following the APA 6th edition on the network diagram and its benefit to the project. Address the following:

· What is the Network Diagram?

· Describe the "Activity on Node" and "Activity on Arrow" diagram.

· What is an early and late start, early and late finish?

· Describe forward and backward pass.

· What is slack or float?

· Explain the critical path.

· Use a minimum of 2 references.

To help you better understand the project management network, you will find two videos below to review.

Youtube Videos:

1. "Project Management Networks Part 1: Project Network Basics AON, AOA, Critical Path"
2. "Project Management Networks Part 2: Forward and Backward Pass"

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also include a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also Include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Business Management: Describe the activity on node and activity on arrow diagram
Reference No:- TGS02966182

Now Priced at $30 (50% Discount)

Recommended (90%)

Rated (4.3/5)