Define a work breakdown structure and describe the


This assignment contains two (2) deliverables: a summary document to be delivered in a word processor document format and a Work Breakdown Structure (WBS) to be delivered in a project file.

Overview:

Imagine that you work as the project manager for an IT department. Your organization has recently approved the development of a mobile application. As the project manager, you will manage the development of the project. The project will include user experience (UX) design by a consultant, graphic design by a team of two contracted designers, and in-house application development by a team of three (3) programmers and a database developer.

Deliverable 1: Summary (MS Word or open source equivalent)

Write a one to two (1-2) page summary document in which you:

Summarize the project requirements and other assumptions (i.e., budget, human resources, workload, environmental dependencies, etc.).

Define a work breakdown structure and describe the methodology behind constructing one.

Deliverable 2: WBS (MS Project or open source equivalent)

Use Microsoft Project or an open source equivalent to create a WBS which addresses the following:

Contain at least five (5) main tasks, one (1) for each of the PMBOK® process areas.

Contain at least thirty (30) line items distributed in five (5) or more work packages.

Contain Work Breakdown Structure Code for each task.

Present duration estimates for each task that results in a duration estimate for the project not to exceed the requirements described in the overview.

Deliverable one (1) of your assignment must follow these formatting requirements:

Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.

Include a cover page containing the title of the assignment, the student's name, the professor's name, the course title, and the date.

The cover page and the reference page are not included in the required assignment page length.

Solution Preview :

Prepared by a verified Expert
Computer Networking: Define a work breakdown structure and describe the
Reference No:- TGS01181576

Now Priced at $50 (50% Discount)

Recommended (94%)

Rated (4.6/5)

A

Anonymous user

4/7/2016 8:06:43 AM

This assignment encloses 2 deliverables: a summary document to be delivered in a word processor document format and a Work Breakdown Structure (WBS) to be delivered in a project file. Whole Overview of given assignment: Suppose that you work as the project manager for an IT department. Your organization has currently endorsed the expansion of a mobile application. As the project manager, you will manage the development of the project. The project will comprise user experience (UX) design via a consultant, graphic design through a team of 2 contracted designers, and in-house application development through a team of three programmers and a database developer. Deliverable 1: Summary (MS Word or open source equivalent Prepare a one to two page summary documents in that you: Summarize the project requirements and other assumptions (for example, budget, human resources, workload, environmental dependencies, and so on.).