Create work breakdown structure in gantt format


Create a Work Breakdown Structure (WBS) and project schedule in Gantt format for E-Mail Upgrade Project.  WBS and resultant schedule must contain following high-level activities:

1.0 Estimate User & System Requirements
2.0 Estimate ODHS Network Suitability
3.0 Perform E-mail System Selection
4.0 Upgrade Ohio Department of Human Service Network & Hardware
5.0 Create E-mail Training
6.0 Deploy E-mail System

Each of the six WBS elements must be decomposed into two or more activities; In addition, three of these six elements must be decomposed into third level consisting of at least two more activities. Hence, there must be six high level WBS elements, twelve or more second level activities (two per the six elements), and six third level activities. Utilize format explained above to define activities (action verb followed by subject, such as Deploy E-mail System).

Gantt chart must be developed based on WBS (all activities must be detailed on Gantt chart). Gantt chart must reflect the proper dependencies of each of activities (for instance, you cannot have "Deploy E-mail System" before "Evaluate User Requirements"). For activity duration, give a reasonable estimate of time you expect each activity to take; while students are not expected to give correct durations, durations must be reasonably defensible and logical. For formatting ease, high level activities must be left justified while second and third level activities must be indented below their parent activities.