Create a work breakdown structure wbs and assign resources


Assignment: Cost and Quality

This assignment is a continuation and enhancement of Assignment 2.

Create a Work Breakdown Structure (WBS), and assign resources and cost by using a project management tool. As the IT project manager, you have been assigned a project to deploy ten (10) wireless access points in your company's warehouse and break room within the next ninety (90) days. You are free to make assumptions that satisfy the scope of the project such as training, wiring, consulting efforts, etc.

Your submission will be made in .mpp format and will be graded on the accuracy of your work package assumptions and duration estimates.

In your assignment, address the following:

  1. Create 15 or more decomposed work packages into 4 levels that are assigned to 5 or more main tasks (75 line items).
  2. Ensure the main WBS tasks headings are the 5 PMBOK® process areas.
  3. Create a Work Breakdown Structure Code for each task.
  4. Determine an overall project duration and duration estimates for each of the tasks. The duration is not to exceed 90 days.
  5. Create accurate work package assumptions and duration estimates.
  6. Include 7 resources assigned in the Resource Sheet as "Work" types and 3 resources assigned as " Material" types.
  7. Ensure the Resources are paid no more than $30/hour and that the "Material" cost per use will not exceed $50.
  8. Include your resources and materials from the Resource Sheet in the task sheet.
  9. Create 10 dependencies in the Task Sheet.