Create a work breakdown structure for the parade


Assignment: Project Management

Length: 5 pages.

Topic: The topic for your project is based on current literature and you are to: Create the necessary documents to organize, plan and complete a project based on the Colorado Springs Welcome Home Parade Case.

Budget: Using either a Microsoft Word Table or an Excel Spreadsheet, create a detailed budget for this project. The numbers you use for this budget should be realistic. For example, if you are going to have to rent folding chairs, conduct some research and find out how much that would cost. If you have to contract a cleaning crew, research various companies that do this and use those numbers. You will be graded on your knowledge of the subject, not the accuracy of the numbers. Your budget must include at least 10 items that you will have to pay for.

Work Breakdown Structure. create a Work Breakdown Structure (WBS) for this parade. Your WBS should include but not be limited to: Planning, Transportation, Food, Entertainment and Clean Up. You can use Word, Excel or PowerPoint to create this diagram.

Format your assignment according to the following formatting requirements:

(1) The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

(2) The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

(3) Also include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Attachment:- Project-Charter.rar

Request for Solution File

Ask an Expert for Answer!!
Project Management: Create a work breakdown structure for the parade
Reference No:- TGS03112121

Expected delivery within 24 Hours