Cpm or pert methods for project scheduling


Question 1:

Critically illustrate out the term operations management. Discuss nature and scope of the operations management.

Question 2:

Illustrate out the term mass and batch production. Discuss their advantages and suitability.

Question 3:

“Good plant layout not only optimises the space utilization however diminishes material handling cost”. Illustrate out the statement describing importance of the good plant layout.

Question 4:

Critically illustrate CPM or PERT methods for the Project scheduling.

Question 5:

Municipal transport service in metropolitan city is facing problem of the accessibility of buses because of the frequent breakdowns. Recommend in details apposite types of the maintenance to improve the situation.

Question 6:

Illustrate out the term acceptance sampling. Under what situations is the acceptance sampling preferred over cent per cent inspection?

Request for Solution File

Ask an Expert for Answer!!
Project Management: Cpm or pert methods for project scheduling
Reference No:- TGS012214

Expected delivery within 24 Hours