Consider a project with the following cash flows -100 230


Consider a project with the following cash flows -100, 230 and -134 at time 0, 1 and 2, respectively. Obtain the NPI (Net Profitability Index) of the project if the cost of capital is 10%. A. 0.0078 B. 0.0084 C. -0.0078 D. -0.0084