Configure the backup route through the serial 010 interface


Assignment

Task

There are Eight tasks to complete in this assignment.

Using Packet tracer implement the following tasks based on the network topology of a small business given below. Smart Sale Pty Ltd has four departments: Sales, Production, Marketing and Management. Its Central office (HQ) controls the connection between Internet Service Provider (ISP) and one local office (R1). Examine the network requirements and complete the eight questions to make the company network service running.

You must submit your answer file in word or pdf and packet tracer file to EASTS by the due date.

Please use your last 4 digits of your student ID as the first two octets of your network address. Keep other bits same as what are shown in the addressing table and the figure below. For example,if your student ID is 11555787, using the last 4 digits (5787). your main network address will be 57.87.0.0.

Consider the following Topology in the figure below:

125_Topology Diagram.jpg

Addressing Table

Device

Interface

IP Address

Subnet Mask

Default Gateway

VLAN N/A

R1

50/0/0

x.x.1.2

255.255.255.0

N/A

G0/0.10

x.x.10.1

255.255.255.0

N/A

10

60/0.20

x.x.20.1

255.255.255.0

N/A

20

60/0.30

x.x.30.1

255.255.255.0

N/A

30

60/0.88

xx.88.1

255.255.255.0

N/A

88

60/0.99

x.x.99.1

255.255.255.0

N/A

99

Si

VIAN 88

x.x.88.33

255.255.255.0

x.x.88.1

88

PC-A

NIC

x.x.10.21

255.255.255.0

x.x.10.1

10

PC-8

NIC

x.x.20.22

255.255.255.0

x.x.20.1

20

PC-C

NIC

x.x.30.23

255.255.255.0

x.x.30.1

30

PC-D

NIC

x.x.88.24

255.255.255.0

x.x.88.1

88

VLAN Table

VIAN

Name

Interfaces

10

Sales

F0/11-15

20

Production

F0/16-20

30

Marketing

F0/5-10

88

Management

F0/21-24

99

Native

61/1

You need to use Packet Tracer to implement the given topology and to complete the following tasks:

1. Configure four VLANs as required on S1 and enable Trunking on S1.

2. Configure inter-VLAN routing on R1 based on the Addressing Table.

3. Configure four directly attached static routes on HQ to four VLANs: 10, 20, 30 and 88.

4. Configure directly attached static routes on HQ to reach Outside Host.

a. Configure the primary path through the Serial 0/1/0 interface.

b. Configure the backup route through the Serial 0/1/1 interface with a 10 AD.

5. Configure directly attached primary and backup summary routes on ISP for the entire x.x.0.0/17 address space.

a. Configure the primary path through the Serial 0/1/1 interface.

b. Configure the backup route through the Serial 0/1/0 interface with 25 AD.

6. Configure a directly attached default route on R1.

7. Verify connectivity by making sure all the PCs can ping Outside Host.

8. Explain and analysis the routing process of three routers in the case of ping from PC-A to Outside Host.

Rationale

In this assessment item, tasks are designed to reinforce the application of configuring routers for inter-VLAN communication and configure static routes to reach destinations outside of your network. Your ability demonstrate your skills at configuring inter-VLAN routing, static and default routes are also included.

The tasks in this assignment relate to Learning Outcome 3 & 4:

- be able to configure and troubleshoot networks to improve efficiency and security;

- be able to configure, verify and solve a variety of problems involving Virtual Local Area Networks;

Solution Preview :

Prepared by a verified Expert
Computer Networking: Configure the backup route through the serial 010 interface
Reference No:- TGS01577446

Now Priced at $40 (50% Discount)

Recommended (94%)

Rated (4.6/5)