Computing wage rate break down


Assignment:

Engineering Category

Wage Rate

Hours projected for Contract

I

$6.50

70

II

$7.50

110

III

$9.00

130

IV

$11.00

30

V

$15.00

10

Q1. Contractor requests the Government accept $9.80/hr. Is that acceptable?

Q2. With respect to the wage rates, what specific information should the wage rate be broken down into?

Your answer must be typed, double-spaced, Times New Roman font (size 12), one-inch margins on all sides, APA format and also include references.

 