Compute the total overhead allocated to each job under a


Activity-based costing The job costing system at Smith's Custom Framing has five indirect cost pools (purchasing, material handling, machine maintenance, product inspection, and packaging). The company is in the process of bidding on two jobs; Job 215, an order of 15 intricate personalized frames, and Job 325, an order of 6 standard personalized frames. The controller wants you to compare overhead allocated under the current simple job-costing system and a newly-designed activity-based job-costing system. Total budgeted costs in each indirect cost pool and the budgeted quantity of activity driver are as follows:

Information related to Job 215 and Job 325 follows. Job 215 incurs more batch-level costs because it uses more types of materials that need to be purchased, moved, and inspected relative to Job 325.

Job 215 Job 325
Number of purchase orders 25 8
Number of material moves 10 4
Machine-hours 40 60
Number of inspections 9 3
Units produced 15 6

1. Compute the total overhead allocated to each job under a simple costing system, where overhead is allocated based on machine-hours.

2. Compute the total overhead allocated to each job under an activity-based costing system using the appropriate activity drivers.

3. Explain why Smith's Custom Framing might favor the ABC job-costing system over the simple job-costing system, especially in its biddingprocess.

Solution Preview :

Prepared by a verified Expert
Cost Accounting: Compute the total overhead allocated to each job under a
Reference No:- TGS0822450

Now Priced at $10 (50% Discount)

Recommended (98%)

Rated (4.3/5)