Compute the sv cv and cpi for the project


Activity Assignment: Project Performance Measurement & Closure

Overview

With the communication issues stabilized, the focus turns to project performance measurement and closure. Chapter 13 presents a discussion on metrics used to assess project performance. Three commonly used metrics are schedule variance (SV), cost variance (CV), and cost performance index (CPI). The sponsor is not familiar with how these metrics work and has asked for a demonstration of how they are used. The sponsor has presented a scenario and is requesting you to conduct a demonstration using fictitious data to access the results given the following situation.

Instructions

i. On day 51, a project has an earned value of $600, an actual cost of $650, and a planned cost of $540. Compute the SV, CV, and CPI for the project. Present your results and explain them.

ii. Next, the project sponsor wants to be assured that the project will be closed in accordance with best practices. Research what the Project Management Body of Knowledge (PMBOK) says about closing projects and briefly discuss it.

Format your assignment according to the following formatting requirements:

i) The answer should be typed, using Times New Roman font (size 12), double spaced, with one-inch margins on all sides.

ii) The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

iii) Also include a reference page. The Citations and references must follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Project Management: Compute the sv cv and cpi for the project
Reference No:- TGS03197662

Now Priced at $40 (50% Discount)

Recommended (90%)

Rated (4.3/5)