Compute the following problem using transportation modeling


Compute the following problem using Transportation Modeling using Excel Solver

Problem 1- A toy manufacturer ships toys from three plants to three regional distribution centers. The shipping costs per carload, plant capacities (in carloads) and demands (in carloads) are given below. Solve the problem and report your transportation assignments, including the total transportation cost.

Center 1 2 3

Plant

A 4 10 6

B 8 16 6

C 14 18 10

Plant Capacities Center Demands

A 100 1 200

B 300 2 300

C 300 3 200

Problem 2- A company produces concrete blocks at three plants. It ships these blocks to each of four construction sites for use in building shopping malls. Given below are the shipping costs (in dollars per truckload from Plant X to Site Y), the capacities for each plant (in truckloads) and the demand of each site (in truckloads). Solve the problem and report your transportation assignments, including the total transportation cost.

Site--> 1 2 3 4

Plant

A 5 12 7 0

B 4 6 7 6

C 2 8 5 3

Plant Capacities Site Demands

A 50 1 40

B 50 2 20

C 60 3 30

4 70

I need help to explain how to set-up and solve the linear programming problems. Also describe transportation modeling using excel solver.

Request for Solution File

Ask an Expert for Answer!!
Operation Research: Compute the following problem using transportation modeling
Reference No:- TGS0964647

Expected delivery within 24 Hours