Compute samples yields values of the test statistics


Discuss the below:

Q. A quality characteristic is monitored by a control chart designed so the probability that a certain out-of-control condition will be detected on the first sample following the shift to that state is 1 - β. Find the following:

a) The probability that the out-of-control condition will be detected on the second sample following the shift.

b) The probability that the out-of-control condition will be detected on the mth sample following the shift.

c) The expected number of sub-groups analyzed before the shift is detected.

d) The probability that the first sample following the shift produces a statistic that plots inside the control limits.

e) The probability that the first sample following the shift produces a statistic that plot inside the control limits.

f) The probability that two consecutive samples produce statistics that plot out-side of the control limits.

g) The probability that at least one of the next m samples yields values of the test statistics that plot out-side the control limits.

Solution Preview :

Prepared by a verified Expert
Basic Statistics: Compute samples yields values of the test statistics