Compute overall system reliability under plan 1


Discuyss the below:

Q: A production line has three machines A, B, and C, with reliabilities of .97, .87, and .88, respectively. The machines are arranged so that if one breaks down, the others must shut down. Engineers are weighing two alternative designs for increasing the line's reliability. Plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. In either case, three machines (A, B, and C) would be used with reliabilities equal to the original three.

a. Compute overall system reliability under Plan 1.

b. Compute overall system reliability under Plan 2.

c. Which plan will provide the higher reliability?

Request for Solution File

Ask an Expert for Answer!!
Operation Management: Compute overall system reliability under plan 1
Reference No:- TGS02053524

Expected delivery within 24 Hours