Compute a b c costs haggerty company makes two types or


Problem - Compute A B C costs. Haggerty company makes two types or products. They are wheels and sprockets.

Wheels: .80Direct Labor Hours Per Unit 10,000 annual production.

Sprockets: .40 Direct Labor Hours per unit. 40,000 annual productions.

Additional information:

a. Wheels require 32$ in direct materials per unit, Sprockets requires 18$.

b. The direct labor wage rate is 15$ per hour

c. Wheels are more complex to manufacture than sprockets and the require special equipment.

d. The ABC system has the following activity pools:




Activity

Activity Cost Pool  

Activity Measure

Est overhead Cost

Wheels

Sprockets

Total

Machine Setups

Number of setups

72000

100

300

400

Special Processing

Machine Hours

200000

5000

0

5000

General Factory

Direct Labor Hours

816000

8000

16000

24000

Required -

Compute the activity rate for each activity cost pool.

Determine the unit product cost of each product according to the A B C system.

Solution Preview :

Prepared by a verified Expert
Accounting Basics: Compute a b c costs haggerty company makes two types or
Reference No:- TGS02573220

Now Priced at $25 (50% Discount)

Recommended (98%)

Rated (4.3/5)