Hutchings Company manufactures and distributes two products, A and K. Overhead costs are currently allocated using the number of units produced as the allocation base. The controller has changing to an activity-based costing ABC. system. She has collected the following information:

Activity

Cost Driver

Amount

A

K

Production setups

Number of setups

$164,000

16

24

Material Handling

Number of parts

96,000

112

48

Packaging costs

Number of units

260,000

160,000

100,000

 

 

$520,000

 

 


A. What is the overhead cost per unit under the current system?
B. What is the total overhead allocated to each product using the current system?
C. What would be the total overhead allocated to each product under ABC costing?
D. What would be the overhead cost per unit under ABC costing?