Calculate the upper and lower p-control limits


Discuss the below:

Q: Cattcon Manufacturing (CM) is an Asian based contract manufacturer of electronic devices. Their clients expect superior quality, yet CM must also contain costs to ensure profitability. They must ensure that assembly employees are working quickly, but also carefully. To help monitor and manage their performance, CM has focused on one of the key assembly activities. Each day, CM measures the time to complete this assembly activity at 25 randomly selected occasions to verify perfomance. The expected time to complete the activity is 48.4 seconds and the normal time standard deviation is 2.1 seconds. Calculate the upper and lower p-control limits based on above information

Request for Solution File

Ask an Expert for Answer!!
Basic Statistics: Calculate the upper and lower p-control limits
Reference No:- TGS02056789

Expected delivery within 24 Hours