Calculate the production-overhead absorption rate


Problem:

The following data relate to a manufacturing department for a period:


Budgeted Data Rs.

Actual Data Rs.

Direct material

1,00,000

1,40,000

Direct labour

2,00,000

2,50,000

Production overhead

2,00,000

2,30,000

Direct labour hours

50,000

62,500

Machine hours

40,000

50,000

Job ZX was one of the jobs worked on during the period. The actual data relating to this job were:

Direct material

Rs. 6,000

Direct labour

Rs. 3,000

Direct labour hours

750

Machine hours

750

Required:

1. Calculate the production-overhead absorption rate predetermined for the period based on:

1. Percentage direct-material cost.

2. Machine hours.

2. Calculate the production overhead cost to be charged to job ZX based on the rates calculated under (a) above.

3. Assuming that the machine hour rate of absorption is used, calculate the under- or over-absorption of production overheads for the period and state the appropriate treatment in the accounts.

Solution Preview :

Prepared by a verified Expert
Accounting Basics: Calculate the production-overhead absorption rate
Reference No:- TGS02041815

Now Priced at $10 (50% Discount)

Recommended (93%)

Rated (4.5/5)