Calculate the additional contingency or primary budget


Assignment: Quality Performance Monitoring And Control

Length: 1,250-1,800 words.

For this assignment, you will further enhance your overall Quality Management Integration Plan by adding in a section to address quality performance monitoring and control. By identifying which methods you will utilize for the quality monitoring and control, you will be able to know-at any given point in the project-if you are on track with quality performance or not.

Add the Quality Performance Monitoring and Control section.

Identify the tasks, task duration, and resources that should be added or already exist in the project plan to monitor and control quality.

Calculate the additional contingency or primary budget that has been set aside for these tasks.

Discuss how you will use at least 2 of the following quality performance tools and techniques to perform monitoring and control:

Cause and effect charts

Control charts

Benchmarking

Flowcharting

Histogram

Pareto chart

Run chart

Scatter diagram

Statistical sampling

Inspection.

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
HR Management: Calculate the additional contingency or primary budget
Reference No:- TGS02975447

Now Priced at $45 (50% Discount)

Recommended (95%)

Rated (4.7/5)