Burrito king a new fast-food franchise opening up


Burrito King (a new fast-food franchise opening up nationwide) has successfully automated burrito production for its drive-up fast-food establishments. The Burro-Master 9000 requires a constant 15 seconds to produce a batch of burritos. It has been estimated that customers will arrive at the drive-up window according to a Poisson distribution at an average of one every 3 seconds. To help determine the amount of space needed for the line at the drive-up window

a. What is the average waiting line length (in cars)? (Do not round intermediate calculations. Round your answer to 2 decimal places.)

b. What is the average number of cars in the system (both in line and at the window)? (Do not round intermediate calculations. Round your answer to 2 decimal places.)

c. What is the expected average time in the system, in minutes? (Do not round intermediate calculations. Round your answer to 2 decimal places.)

Request for Solution File

Ask an Expert for Answer!!
Operation Management: Burrito king a new fast-food franchise opening up
Reference No:- TGS02589619

Expected delivery within 24 Hours