Bn3050 - what are the best ways that can be done to


A mega construction commercial project, has started a year ago with duration of 5 years, there were some changes in the plan and design after the construction stage has started, conflicts has started between the project team.

1. As an expert witness, how such conflicts can be handle, identify the meaning of expert witness, roles and duties.

2. What are the best ways that can be done to complete the project successfully?

3. Do you think after change the project will be completed successfully as planned, if so, please identify the effects of disputes.

4. Presentation.

5. References

Guidelines for the Report

1. Use preferably Microsoft Word for submitting the report. Use A-4 size paper and Times New Roman settings, leaving 2.5 cm (or) 1'' inch margins in all the four sides.

2. Body text should be Times New Roman font with 12 point, 1.5 spacing. Text should be justified leaving one blank line between two paragraphs.

3. The entire report should be numbered consecutively, starting with the introduction page.

4. The number of words must be shown at the end of the work submitted before the reference section.

5. The report should contain a title page and table of content page before starting the introduction; however these pages will not be counted in the total word count of the report.

Solution Preview :

Prepared by a verified Expert
Project Management: Bn3050 - what are the best ways that can be done to
Reference No:- TGS02546126

Now Priced at $70 (50% Discount)

Recommended (94%)

Rated (4.6/5)