Based on the data in figure complete a net material


Based on the data in Figure, complete a net material requirements schedule for:

a) All items (10 schedules in all), assuming the requirement for each BOM item is 1.

b) All 10 items, assuming the requirement for all items is 1, except B, C, and F, which require 2 each.