Balance the assembly line using the information below and


Balance the assembly line using the information below, and the most following task rule. The desired output is 360 units per day. Available production time per day is 8 hours. (Task), (time in seconds) (immediate predeccesors) A 30 ---. B 20 A. C 50 A. D 45 B. E 30 B. F 55 C,D. G 35 D,E. H 40 F. Draw the precedence diagram. b. Determine the minimum number of stations needed. c. Assign task to each work station. d. What is the efficiency? e. What is the percentage of idle time?