At long co electricity cost starts with a minimum fixed


Problem

At Long Co. electricity cost starts with a minimum fixed cost, and after that, there is a perfectly variable expense. Using estimated machine hours:

Machine hours       Cost
50,000               $68,000
60,000               $80,000

What is the a) estimated variable cost per machine hour and what is the b) estimated TOTAL fixed cost?

Solution Preview :

Prepared by a verified Expert
Accounting Basics: At long co electricity cost starts with a minimum fixed
Reference No:- TGS02615366

Now Priced at $15 (50% Discount)

Recommended (94%)

Rated (4.6/5)