1. Eight work centers must be arranges in an L-shaped building. The locations of centers 1 and 3 are assigned as shown. Assuming that transportation costs are $1 per load per meter, develop a suitable layout that minimizes transportation costs using the given information. Compute the total cost. (Assume the reverse distances are the same.) 