Assume that a small town has a peak electrical demand of


Assume that a small town has a peak electrical demand of 105 MW, increasing at a compounded rate of 10% per year. The current generating capacity is 240MW.

a) How soon will additional capacity be needed?

b) If the new generator is designed to handle the load 5 years beyond the date above (a), what size should it be? Assume the current generators continue in use.